Description
Application Process:
Coverage:
2 coats Cool Guard + 2 coats CoolTops + 1 Coat Transeal:
- CoolGuard Base Coat (Powder form material mixed with 2:2.5 water dilution (2kg: 2.5Lt Water)
- Every 2Kg: 180-220 sft coverage
Per CoolTops Eco coat – 20% dilution
- 20kg – 2000sft ( per 2 coats – 1000 sft)
- 5kg – 500sft (per 2 coats – 250 sft)
Per Transeal Top coat – NO dilution
- 20kg – 2400 sft
- 5kg – 600 sft (per 2 coats – 250 sft)
So for a 1000sft roof you will require 25Kg (20kg (10 packs of 2kg) CoolGuard + 20Kg CoolTops + around 10Kg Transeal).
Method:
- Clean Substrate – Remove Dust, Dirt, algae and Protrusions using chisel, Hammer, Water Spray and Mop.
- Apply a Base coat of Cool guard – Every 2Kg- 2.5Lt Water: 180-220 sft coverage
- Apply 2nd Base coat of Cool Gaurd – Every 2Kg- 2.5Lt Water: 180-220 sft coverage
- Apply in cross coat/ Perpendicular to give good hiding
- Apply 1st Coat of Cooltops: Dilute CoolTop 1kg paint with 200ml Water (20Kg:4Lt) Coverage: 100sft/ kg (Apply in the perpendicular direction)
- Apply 2nd Coat of Cooltops: Dilute CoolTop 1kg paint with 200ml Water (20Kg:4Lt) Coverage: 100sft/ kg
- (Apply in perpendicular direction)
- 4) Apply Top Coat of Transeal (Undiluted): Apply final coat of transeal using spray or roller brush.
- Allow 2Hr Curing between each coat.




Reviews
There are no reviews yet.